• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Jib Operation
Figure 9. Hoist Plug Installation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  295    296    297    298    299  300  301    302    303    304    305  
img
.
TM 5-3820-276-10-1
0026
MANUAL SLING LOADING OF DRILL RODS WWDR - Continued
WARNING
Do not exceed the maximum allowable line pull limit for the 18 K main winch (jib).
The full drum line pull is 17,594 lb (7,981 kg). Failure to comply may result in injury
or death to personnel. Seek medical attention in the event of an injury.
Never operate winch with less than five wraps of cable on winch drum. Failure to
comply may result in injury or death to personnel. Seek medical attention in the
event of an injury.
Always wear gloves when handling winch cables. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
Check the inspection date of all lifting devices. Never use lifting device that has an
expired inspection date. Failure to comply may result in injury or death to
personnel. Seek medical attention in the event of an injury.
15.
Install hoist plug (Figure 8, Item 2) on jib hook (Figure 8, Item 1).
1
2
WWDS00638
Figure 8.
Hoist Plug and Jib Hook.
0026-8
02/13/2013root(opusualwp)wpno(O10011)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.