• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Automated Drill Rod Handling Arm Raised
Figure 8. Hoist Plug and Jib Hook

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  294    295    296    297    298  299  300    301    302    303    304  
img
.
TM 5-3820-276-10-1
0026
MANUAL SLING LOADING OF DRILL RODS WWDR - Continued
CAUTION
Ensure jib line is free of obstructions before turning jib. Failure to comply may result in
damage to equipment.
13.
Push JIB ROTATE/RAISE/LOWER control lever (Figure 7, Item 2) to left position to turn jib
(Figure 7, Item 1) inward.
1
2
4
3
WWDS00884
Figure 7.
Jib Operation.
14.
Pull main winch control lever (Figure 7, Item 3) back to lower jib cable and hook (Figure 7, Item 4).
0026-7
02/13/2013root(opusualwp)wpno(O10011)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.