• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 42. Drill Rod Handling System WWDR Connector Plug Cap Installation.
Figure 1. Tophead Lubrication.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  270    271    272    273    274  275  276    277    278    279    280  
img
. . . .
TM 5-3820-276-10-1
0025
OPERATOR MAINTENANCE
AUTOMATED ROD HANDLING SYSTEM (ARHS) OPERATION - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (cont.)
Brush, Dope
(Volume 2, WP 0233, Table 1, Item 2)
(Volume 2, WP 0231, Table 1, Item 6)
Equipment Condition
Materials/Parts
WWDR fully setup and engine on (WP 0017)
Antiseize Compound
Initial drill rod installed (WP 0027)
Drill bit installed (WP 0028)
ARHS OPERATION
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
1.
Apply antiseize compound to threads (Figure 1, Item 3) of tophead (Figure 1, Item 1).
0025-1
02/13/2013root(opusualwp)wpno(O10009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.