TM 5-3820-276-10-1
0025
ARHS OPERATION - Continued
1
3
2
WWDS00662
Figure 1.
Tophead Lubrication.
2.
Push FAST FEED control (Figure 1, Item 2) forward to raise tophead (Figure 1, Item 1) to top.
3.
Set and hold PIPE POSITIONING ARM CLAMP switch (Figure 2, Item 6) to up position to make sure
clamps (Figure 2, Item 4) are locked onto drill rod (Figure 2, Item 5).