TM 5-3820-276-10-1
OPERATOR MAINTENANCE
INITIAL DRILL ROD INSTALLATION AND REMOVAL - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Tools and Special Tools
References
Brush, Dope
(Volume 2, WP 0231, Table 1, Item 6)
Materials/Parts
Equipment Condition
Antiseize Compound
(Volume 2, WP 0233, Table 1, Item 2)
Personnel Required
Two
0027-1
02/13/2013root(opusualwp)wpno(O10019)