MANUAL SLING UNLOADING OF DRILL RODS OPERATION WWDR - Continued
WARNING
Make sure only authorized personnel are present for operation. Failure to comply may
result in injury or death to personnel. Seek medical attention in the event of an injury.
17.
With aid of an assistant, pull main winch control (Figure 22, Item 1) back to lower drill rod (Figure 22, Item 2)
to ground.
18.
Remove hoist plug (Figure 23, Item 3) from drill rod (Figure 23, Item 2).
1
2
3
WWDS00639
Figure 23. Hoist Plug Removal.
19.
Remove 8-ft nylon web sling (Figure 23, Item 1) from other end of drill rod (Figure 23, Item 2).
20.
Repeat Steps 1 through 19 to manually sling unload remaining drill rods.
END OF TASK
END OF WORK PACKAGE