Figure 17. Jib Operation for Drill Rod Removal.
Figure 19. Drill Rod Tooling Joint Alignment for Drill Rod Removal.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  305    306    307    308    309  310  311    312    313    314    315  
img
.
TM 5-3820-276-10-1
0026
MANUAL SLING UNLOADING OF DRILL RODS OPERATION WWDR - Continued
2.
Pull main winch control (Figure 17, Item 3) back to lower jib cable and hook (Figure 17, Item 4).
WARNING
Do not exceed the maximum allowable line pull limit for the 18 K main winch (jib).
The full drum line pull is 17,594 lb (7,981 kg). Failure to comply may result in injury
or death to personnel. Seek medical attention in the event of an injury.
Never operate winch with less than five wraps of cable on winch drum. Failure to
comply may result in injury or death to personnel. Seek medical attention in the
event of an injury.
Always wear gloves when handling winch cables. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
Check the inspection date of all lifting devices. Never use lifting device that has an
expired inspection date. Failure to comply may result in injury or death to
personnel. Seek medical attention in the event of an injury.
3.
Install hoist plug (Figure 18, Item 2) in jib hook (Figure 18, Item 1).
1
2
3
WWDS00692
Figure 18. Hoist Plug Installation.
0026-18