• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Hoist Plug Installation.
Figure 20. Jib Operation for Drill Rod String Removal.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  306    307    308    309    310  311  312    313    314    315    316  
img
.
TM 5-3820-276-10-1
0026
MANUAL SLING UNLOADING OF DRILL RODS OPERATION WWDR - Continued
CAUTION
Make sure hoist plug threads are clean and free of debris. Failure to comply may result in
damage to equipment.
4.
Apply antiseize compound to threads of hoist plug (Figure 18, Item 2).
WARNING
Make sure hoist plug swivels freely, without loosening connection, when attached to drill
rod. Failure to comply may result in injury or death to personnel. Seek medical attention in
the event of an injury.
5.
Install hoist plug (Figure 18, Item 2) in drill rod (Figure 18, Item 3).
6.
Push main winch control lever (Figure 19, Item 4) forward to raise lower drill rod (Figure 19, Item 1) up until
top of tooling joint (Figure 19, Item 2) is approximately 0.5 in. (13 mm) above top of fork (Figure 19, Item 3).
1
4
2
3
5
WWDS00693
Figure 19. Drill Rod Tooling Joint Alignment for Drill Rod Removal.
7.
Set and hold FORK switch (Figure 19, Item 5) in up position to retract fork (Figure 19, Item 3).
0026-19
02/13/2013root(opusualwp)wpno(O10011)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.