OPERATOR MAINTENANCE
POST OPERATION PROCEDURES - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Tools and Special Tools
References
Wrench, Combination 1-1/8-in.
(Volume 2, WP 0231, Table 1, Item 68, Table
1, Item 99)
Equipment Condition
Wrench, Internal Wrenching, 1/2-in.
(Volume 2, WP 0231, Table 1, Item 100)
Personnel Required
Three
HOSE REMOVAL FROM STANDPIPE
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
1.
0029-1
02/13/2013root(opusualwp)wpno(O10014)