• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 19. Hoist Plug Installation.
Figure 21. Hoist Plug to Jib Hook Installation.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  338    339    340    341    342  343  344    345    346    347    348  
img
.
TM 5-3820-276-10-1
0028
DRILL BIT REMOVAL - Continued
11.
With aid of an assistant, push JIB ROTATE/RAISE/LOWER control lever (Figure 20, Item 2) to left position
to turn jib (Figure 20, Item 1) inward.
1
2
4
3
WWDS00884
Figure 20. Jib Operation.
12.
With aid of an assistant, pull main winch control lever (Figure 20, Item 3) back to lower jib cable and hook
(Figure 20, Item 4).
CAUTION
Ensure jib line is free of obstructions before turning jib. Failure to comply may result in
damage to equipment.
13.
With aid of an assistant, install jib hook (Figure 21, Item 3) to hoist plug (Figure 21, Item 4).
0028-16
02/13/2013root(opusualwp)wpno(O10012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.