• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Grouter Platform in Raised Position.
Figure 5. Mount Pin Installation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  489    490    491    492    493  494  495    496    497    498    499  
img
. .
TM 5-3820-276-10-1
0042
GROUTER POST OPERATION - Continued
1
2
3
WWDS00391
Figure 3.
Lifting Strap Installation.
WARNING
When loading or off loading grouter, always use nylon web sling (tag line) to prevent unit
from swinging. Failure to comply may result in injury or death to personnel. Seek medical
attention in the event of an injury.
5.
With aid of an assistant, use crane (Figure 4, Item 1) and lift grouter (Figure 4, Item 2) onto WWSV
(WP 0034).
1
2
WWDS00390
Figure 4.
Grouter Lifting.
0042-3
02/13/2013root(opusualwp)wpno(O20019)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.