TM 5-3820-276-10-1
OPERATOR MAINTENANCE
POST OPERATION PROCEDURES - GROUTER
INITIAL SETUP:
Tools and Special Tools
References
Sling, Nylon Web, 8-ft, Choker Type (Qty 2)
(Volume 2, WP 0231, Table 1, Item 58)
Sling, Nylon Web, 16 Feet Choker Type (Volume
Equipment Condition
2, WP 0231, Table 1, Item 59)
Water Well Support Vehicle (WWSV) setup
Personnel Required
Two
GROUTER POST OPERATION
1.
Secure clean-up hose (Figure 1, Item 3) and main grout hose (Figure 1, Item 4) to grouter frame.
1
4
3
2
WWDS00437
Figure 1.
Water Pump Suction Hose Disconnect.
2.
Disconnect water hose (Figure 1, Item 1) from water pump suction hose (Figure 1, Item 2) on grouter.