POST OPERATION PROCEDURES - GROUTER
Figure 3. Lifting Strap Installation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  488    489    490    491    492  493  494    495    496    497    498  
img
.
TM 5-3820-276-10-1
0042
GROUTER POST OPERATION - Continued
3.
Raise platform (Figure 2, Item 2) rotate latch (Figure 2, Item 1).
1
2
WWDS00436
Figure 2.
Grouter Platform in Raised Position.
WARNING
Check the inspection date of all lifting devices. Never use lifting device that has an expired
inspection date. Failure to comply may result in injury or death to personnel. Seek medical
attention in the event of an injury.
4.
Install two lifting straps (Figure 3, Item 2) to crane hook (Figure 3, Item 1) and grouter lifting rings
(Figure 3, Item 3).
0042-2
02/13/2013root(opusualwp)wpno(O20019)