• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Cab Post Operation.
Figure 1. WWSV Setup Location (Typical)

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  398    399    400    401    402  403  404    405    406    407    408  
img
. .
TM 5-3820-276-10-1
0032
OPERATOR MAINTENANCE
SETUP PROCEDURES - WATER WELL SUPPORT VEHICLE (WWSV)
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Level, 24-in.
Engine on (WP 0012)
(Volume 2, WP 0231, Table 1, Item 42)
Personnel Required
Two
CAB SETUP PROCEDURES
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
NOTE
Position WWSV on ground as stable and level as possible.
See Figure 1 for a general diagram of a typical drill site setup. Drill operator will
determine the best position for setting up equipment for each specific drill site.
1.
Position WWSV in a location where ground is as stable and level as possible (Figure 1).
0032-1
02/13/2013root(opusualwp)wpno(O20002)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.