• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. NATO Slave Cable Installation.
NATO SLAVE CONNECTOR REPLACEMENT - Continued

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  596    597    598    599    600  601  602    603    604    605    606  
img
.
TM 5-3825-270-23&P
0101
INSTALLATION - Continued
9
10, 11
12
5
14
Figure 7. NATO Slave Connector Installation.
8.
Install NATO slave box (Figure 8, Item 5) onto battery box (Figure 8, Item 1) with four screws (Figure 8, Item
2), washers (Figure 8, Item 3), and locknuts (Figure 8, Item 4).
1
2, 3, 4
5
Figure 8. NATO Slave Box Installation.
END OF TASK
0101-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.