• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. NATO Slave Cable Removal.
Figure 6. NATO Slave Cable Installation.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  594    595    596    597    598  599  600    601    602    603    604  
img
.
TM 5-3825-270-23&P
0101
REMOVAL - Continued
9
15 16
17 18 19
5
6
Figure 4. NATO Slave Cable Removal.
5.
Pull back protective cover (Figure 4, Item 19) on positive battery cable (Figure 4, Item 18) to expose screw
(Figure 4, Item 17).
6.
Remove screw (Figure 4, Item 17), lockwasher (Figure 4, Item 16), and positive battery cable (Figure 4, Item
18) from NATO slave receptacle (Figure 4, Item 9). Discard lockwasher.
7.
Remove NATO slave receptacle (Figure 4, Item 9), gasket (Figure 4, Item 15), and NATO slave box (Figure
4, Item 5) from positive battery cable (Figure 4, Item 18) and negative battery cable (Figure 4, Item 6).
END OF TASK
INSTALLATION
1.
Install NATO slave box (Figure 5, Item 5) over positive battery cable (Figure 5, Item 18) and negative battery
cable (Figure 5, Item 6).
9
15 16
17 18 19
5
6
Figure 5. NATO Slave Cable Installation.
2.
Install gasket (Figure 5, Item 15) and NATO slave receptacle (Figure 5, Item 9) on NATO slave box (Figure 5,
Item 5). Do not install screws.
0101-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.