• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAIN CONTROL BOX REPLACEMENT - Continued
Figure 2. NATO Slave Cable Removal.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  592    593    594    595    596  597  598    599    600    601    602  
img
. . . . . . . .
TM 5-3825-270-23&P
0101
FIELD MAINTENANCE
NATO SLAVE CONNECTOR REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (cont.)
Tool Kit, General Mechanic's: Automotive
Lockwasher (WP 0226, Table 1, Item 75) Qty: 2
(WP 0225, Table 1, Item 12)
Locknut (WP 0226, Table 1, Item 63) Qty: 4
Materials/Parts
References
Locknut (WP 0226, Table 1, Item 77) Qty: 4
Parts Manual (WP 0220) Figure 4009
Equipment Condition
Batteries removed. (WP 0086)
REMOVAL
1.
Remove four locknuts (Figure 1, Item 4), screws (Figure 1, Item 2), washers (Figure 1, Item 3), and NATO
slave box (Figure 1, Item 5) from battery box (Figure 1, Item 1). Discard locknuts.
1
2, 3, 4
5
Figure 1. NATO Slave Box Removal.
2.
Remove screw (Figure 2, Item 7), lockwasher (Figure 2, Item 8), and negative battery cable (Figure 2, Item 6)
from NATO slave receptacle (Figure 2, Item 9). Discard lockwasher.
0101-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.