• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
NATO SLAVE CONNECTOR REPLACEMENT
Figure 4. NATO Slave Cable Removal.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  593    594    595    596    597  598  599    600    601    602    603  
img
.
TM 5-3825-270-23&P
0101
REMOVAL - Continued
6
7
8
9
Figure 2. NATO Slave Cable Removal.
3.
Remove four locknuts (Figure 3, Item 11), screws (Figure 3, Item 10), lanyard (Figure 3, Item 14), cover (Figure
3, Item 12), and NATO slave receptacle (Figure 3, Item 9) from NATO slave box (Figure 3, Item 5). Discard
locknuts.
9
10, 11
12
5
14
Figure 3. NATO Slave Connector Removal.
4.
Rotate NATO slave box (Figure 4, Item 5) around NATO slave receptacle (Figure 4, Item 9) so that positive
battery cable (Figure 4 Item 18) is visible.
0101-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.