• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOW BAR INSTALLATION AND REMOVAL - WATER WELL DRILLING RIG (WWDR) AND WATER WELL SUPPORT VEHICLE (WWSV)
Figure 3. Left-Side Tow Bar Link and Bushing Installation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  673    674    675    676    677  678  679    680    681    682    683  
img
.
TM 5-3820-276-10-1
0068
TOW BAR INSTALLATION - Continued
WARNING
Tow bar weighs approximately 450 lb (204 kg). Do not attempt to lift, move, install, or
remove without the aid of an assistant and suitable lifting device. Failure to comply may
result in injury or death to personnel. Seek medical attention in the event of an injury.
CAUTION
Use caution when installing or removing tow bar. Do not let tow bar contact lines, hoses, or
winch mount. Failure to comply may result in damage to equipment.
NOTE
Tow bar is installed the same way on WWSV and WWDR. WWDR shown.
2.
With aid of assistants, using suitable lifting device, align tow bar (Figure 2, Item 2) with vehicle tiedowns
(Figure 2, Item 1).
1
2
1
2
WWDS00759
Figure 2.
Tow Bar Installation.
3.
Install assembled link (Figure 3, Item 1) with bushing (not shown) to tow bar (Figure 3, Item 2) and tiedown.
0068-2
02/13/2013root(opunuwp)wpno(O00012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.