• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Left-Side Tow Bar Link Installation
Figure 6. Right-Side Outer Tow Bar Link Installation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  676    677    678    679    680  681  682    683    684    685    686  
img
.
TM 5-3820-276-10-1
0068
TOW BAR INSTALLATION - Continued
1
2
3
WWDS00762
Figure 5.
Right-Side Tow Bar Link Installation.
7.
Install bushing (Figure 5, Item 3) to tiedown (Figure 5, Item 2).
0068-5
02/13/2013root(opunuwp)wpno(O00012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.