• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Tow Bar Removal
Figure 10. Right-Side Outer Tow Bar Link Removal.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  680    681    682    683    684  685  686    687    688    689    690  
img
.
TM 5-3820-276-10-1
0068
TOW BAR REMOVAL - Continued
WARNING
Tow bar weighs approximately 450 lb (204 kg). Do not attempt to lift, move, install, or
remove without the aid of an assistant and suitable lifting device. Failure to comply may
result in injury or death to personnel. Seek medical attention in the event of an injury.
CAUTION
Use caution when installing or removing tow bar. Do not let tow bar contact lines, hoses, or
winch mount. Failure to comply may result in damage to equipment.
2.
Remove two bolts (Figure 9, Items 4 and 12), lockwashers (Figure 9, Items 3 and 13), washers
(Figure 9, Items 2 and 14), and link (Figure 9, Item 1) from two bushings (not shown).
5
6
7
8
9
10
1
2
3
4
11
14
13
12
WWDS00764
Figure 9.
InsideTow Bar Link Removal.
3.
Remove two bolts (Figure 9, Items 5 and 8), lockwashers (Figure 9, Items 6 and 9), washers
(Figure 9, Items 7 and 10), and link (Figure 9, Item 11) from two bushings (not shown).
0068-9
02/13/2013root(opunuwp)wpno(O00012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.