• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Right-Side Outer Tow Bar Link Installation
Figure 8. Tow Bar Removal

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  678    679    680    681    682  683  684    685    686    687    688  
img
.
TM 5-3820-276-10-1
0068
TOW BAR INSTALLATION - Continued
5
6
7
8
9
10
1
2
3
4
11
14
13
12
WWDS00764
Figure 7.
Inside Tow Bar Link Installation.
10.
Install link (Figure 7, Item 1), two bolts (Figure 7, Items 4 and 12), lockwashers (Figure 7, Items 3 and 13),
and washers (Figure 7, Items 2 and 14) to two bushings (not shown). Tighten eight bolts.
CAUTION
Do not tow vehicle until maintenance personnel have torqued bolts to 220 lb-ft (298 Nm).
Failure to comply may result in damage to equipment.
11.
Remove suitable lifting device.
END OF TASK
0068-7
02/13/2013root(opunuwp)wpno(O00012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.