• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Tow Bar Installation
Figure 4. Left-Side Tow Bar Link Installation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  674    675    676    677    678  679  680    681    682    683    684  
img
.
TM 5-3820-276-10-1
0068
TOW BAR INSTALLATION - Continued
1
2
3
WWDS00760
Figure 3.
Left-Side Tow Bar Link and Bushing Installation.
4.
Install bushing (Figure 3, Item 3) to tow bar (Figure 3, Item 2) and tiedown.
0068-3
02/13/2013root(opunuwp)wpno(O00012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.