• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Drilling Rig Auxiliary Connections Post Operation.
Figure 14. Mud Pump Auxiliary Hoses.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  670    671    672    673    674  675  676    677    678    679    680  
img
.
TM 5-3820-276-10-1
0067
POST AUXILIARY MUD PUMP OPERATION - Continued
8.
Install cap (Figure 13, Item 3) to hose (Figure 13, Item 2).
1
2
4
3
WWDS00576
Figure 13. Mud Pump Auxiliary Hoses Post Operation.
9.
Install plug (Figure 13, Item 4) to hose (Figure 13, Item 1).
10.
Wrap hoses (Figure 14, Items 1 and 2) to front of mud cleaning system.
0067-14
02/13/2013root(opunuwp)wpno(O40012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.