TM 5-3820-276-10-1
0067
POST AUXILIARY MUD PUMP OPERATION - Continued
1
2
4
3
WWDS00577
Figure 12. Drilling Rig Auxiliary Connections Post Operation.
7.
Install plug (Figure 12, Item 2) to drilling rig connection (Figure 12, Item 1).
02/13/2013root(opunuwp)wpno(O40012)