• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Mud Pump Auxiliary Hose Connections Post Operation.
Figure 13. Mud Pump Auxiliary Hoses Post Operation.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  669    670    671    672    673  674  675    676    677    678    679  
img
.
TM 5-3820-276-10-1
0067
POST AUXILIARY MUD PUMP OPERATION - Continued
1
2
4
3
WWDS00577
Figure 12. Drilling Rig Auxiliary Connections Post Operation.
7.
Install plug (Figure 12, Item 2) to drilling rig connection (Figure 12, Item 1).
0067-13
02/13/2013root(opunuwp)wpno(O40012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.