• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Left-Side Tow Bar Link and Bushing Removal.
Figure 15. Tow Bar Link, Bolt, Washer, Lockwasher, and Bushing.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  685    686    687    688    689  690  691    692    693    694    695  
img
.
TM 5-3820-276-10-1
0068
TOW BAR REMOVAL - Continued
WARNING
Tow bar weighs approximately 450 lb (204 kg). Do not attempt to lift, move, install, or
remove without the aid of an assistant and suitable lifting device. Failure to comply may
result in injury or death to personnel. Seek medical attention in the event of an injury.
10.
Remove tow bar (Figure 14, Item 2) from tiedowns (Figure 14, Item 1).
1
2
1
2
WWDS00759
Figure 14. Tow Bar Removal.
0068-14
02/13/2013root(opunuwp)wpno(O00012)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.