• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. Pintle Hook Safety Pin Installation.
Figure 1. Left-Side Controls (Starting)

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  563    564    565    566    567  568  569    570    571    572    573  
img
. . . . .
TM 5-3820-276-10-1
0053
OPERATOR MAINTENANCE
OPERATING PROCEDURES - MUD CLEANING SYSTEM (MCS)
INITIAL SETUP:
Personnel Required
Equipment Condition (cont.)
Three
Water Well Drilling Rig Setup (WP 0017)
MCS setup (WP 0049)
Engine on (WP 0050)
Equipment Condition
Wheels chocked (WP 0015)
MUD CLEANING SYSTEM OPERATION
WARNING
Do not operate the desander pump at a hydraulic pressure above 5,000 psi (34,474 kPa).
Keep the hydraulic pressure below 5,000 psi (34,474 kPa). Make sure a pressure relief
valve is installed and is in good working order. Failure to comply may result in injury or
death to personnel. Seek medical attention in the event of an injury.
1.
Turn SYSTEM RUN/ENGINE START lever (Figure 1, Item 2) to SYSTEM RUN position.
0053-1
02/13/2013root(opusualwp)wpno(O40007)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.