TM 5-3820-276-10-1
OPERATOR MAINTENANCE
ENGINE STARTING AND SHUTDOWN PROCEDURES - MUD CLEANING SYSTEM (MCS)
INITIAL SETUP:
Equipment Condition
MCS ENGINE STARTING PROCEDURE
1.
Position SYSTEM RUN/ENGINE START lever (Figure 1, Item 7) to ENGINE START position.
5
6
7
2
1
3
10
4
8
9
WWDS00025
Figure 1.
Mud Cleaning System Controls.
2.
Position P/U PUMP lever (Figure 1, Item 6) to OFF position.
3.
Position DESANDER lever (Figure 1, Item 5) to OFF position.
4.
Rotate ignition switch (Figure 1, Item 8) to RUN position and ensure PREHEAT light (Figure 1, Item 4) goes
off.