TM 5-3820-276-10-1
0049
OPERATOR MAINTENANCE
SETUP PROCEDURES - MUD CLEANING SYSTEM (MCS)
INITIAL SETUP:
Personnel Required
References
Three
WP 0036
SETUP LOCATION
NOTE
Position MCS on ground as stable and level as possible.
Make sure drill operator has a clear view of MCS operator.
See Figure 1 for a general diagram of a typical drill site set up. Drill operator will
determine best position for setting up equipment for each specific drill site.
1.
Position MCS in a location where ground is as stable and level as possible (Figure 1).
C
C
PORTABLE
O
O
N
N
AIR
E
E
COMPRESSOR
X
X
(PAC)
WATER
WELL
DRILLING
RIG
WATER
(WWDR)
WELL
MUD
SUPPORT
CLEANING
VEHICLE
SYSTEM
(WWSV)
(MCS)
WWDS00225
Figure 1.
MCS Setup Location (Typical).
2.
Level area prior to positioning MCS near drilling rig, if required.
END OF TASK
0049-1
02/13/2013root(opusualwp)wpno(O40005)