• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Work Platform.
SETUP PROCEDURES - MUD CLEANING SYSTEM (MCS)

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  530    531    532    533    534  535  536    537    538    539    540  
img
. .
TM 5-3820-276-10-1
0048
POST CAB PROCEDURES
1.
Depress clutch pedal (Figure 12, Item 1).
2
1
3
4
6
5
WWDS00256
Figure 12. Cab Controls.
2.
Push button (Figure 12, Item 2) and move P.T.O. lever (Figure 12, Item 3) to OUT position.
3.
Ensure P.T.O. ENGAGED light (Figure 12, Item 4) goes off when P.T.O. is disengaged.
4.
Ensure gearshift lever (Figure 12, Item 5) is in Neutral.
5.
Ensure PARKING BRAKE valve (Figure 12, Item 6) is set.
6.
Release clutch (Figure 12, Item 1).
7.
Shutdown WWSV engine (WP 0012).
END OF TASK
END OF WORK PACKAGE
0048-13/blank
02/13/2013root(opusualwp)wpno(O20009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.