SETUP PROCEDURES - MUD CLEANING SYSTEM (MCS)
Figure 3. Steps Setup

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  532    533    534    535    536  537  538    539    540    541    542  
img
.
TM 5-3820-276-10-1
0049
LEVELING JACK SETUP
NOTE
Use of wood dunnage under frame and leveling jacks of MCS is recommended to prevent
shifting once supported.
1.
Remove lockpin (Figure 2, Item 1) and rotate leveling jack (Figure 2, Item 2) to vertical position.
1
2
8
7
3
4
6
5
WWDS00049
Figure 2.
Leveling Jack Setup.
2.
Align hole on leveling jack (Figure 2, Item 2) and install lockpin (Figure 2, Item 1).
3.
Pull lockpin (Figure 2, Item 4) and push down on spring loaded foot of leveling jack (Figure 2, Item 5),
release lockpin.
4.
Position wood dunnage under frame and leveling jacks of MCS, if required.
5.
Remove safety pin (Figure 2, Item 6) from pin (Figure 2, Item 8).
6.
Remove pin (Figure 2, Item 8) from bracket (Figure 2, Item 3).
7.
Remove crank handle (Figure 2, Item 7) from bracket (Figure 2, Item 3) and fold open.
8.
Turn crank handle (Figure 2, Item 7) clockwise to lower leveling jack (Figure 2, Item 2) to stabilize MCS.
END OF TASK