TM 5-3820-276-10-1
0048
POST CATWALK AND REAR WORK PLATFORM PROCEDURES - Continued
28.
Pull pin (Figure 11, Item 2), raise work platform (Figure 11, Item 1), and lock in raised position with pin.
1
2
4
3
WWDS00257
Figure 11. Work Platform.
29.
Pull pin (Figure 11, Item 4), close step (Figure 11, Item 3), and lock in closed position with pin.
END OF TASK
02/13/2013root(opusualwp)wpno(O20009)