TM 5-3820-276-10-1
OPERATOR MAINTENANCE
WATER PUMP OPERATION - WATER WELL SUPPORT VEHICLE (WWSV)
INITIAL SETUP:
Tools and Special Tools
Personnel Required
20-ft X 2-in. Combination Suction/Fill Hoses
Two
(2 Ea)
(Volume 2, WP 0231, Table 1, Item 9)
Equipment Condition
Suction Strainer
(Volume 2, WP 0231, Table 1, Item 66)
WWSV WATER PUMP OPERATION SETUP
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
NOTE
Water pump has two modes of operation: (1) to load water, (REVERSE position), and (2)
to off-load water, (ON position).
1.
Depress clutch pedal (Figure 1, Item 4).
0036-1
02/13/2013root(opusualwp)wpno(O20006)