• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Load Water - Water Pump Connections (Shutoff Valve Shown Closed)
Figure 5. Engaging P.T.O.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  454    455    456    457    458  459  460    461    462    463    464  
img
.
TM 5-3820-276-10-1
0036
WWSV WATER PUMP OPERATION LOAD WATER - Continued
1
2
WWDS00917
Figure 4.
Water Tank Gauge.
9.
Fill water tank until gauge (Figure 4, Item 2) indicates water tank is filled to desired level.
10.
Rotate water tank gauge cover (Figure 4, Item 1) down to cover water tank gauge (Figure 4, Item 2).
END OF TASK
0036-5
02/13/2013root(opusualwp)wpno(O20006)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.