DRILL ROD STORAGE CARTRIDGE UNLOADING - Continued
Figure 1. Tophead Lubrication

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  229    230    231    232    233  234  235    236    237    238    239  
img
. . . .
TM 5-3820-276-10-1
0024
OPERATOR MAINTENANCE
MANUAL OPERATION OF ROD HANDLING SYSTEM - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Brush, Dope
Two
(Volume 2, WP 0231, Table 1, Item 6)
Equipment Condition
Materials/Parts
WWDR fully setup with engine on (WP 0017)
Antiseize Compound
Initial drill rod installed (WP 0027)
(Volume 2, WP 0233, Table 1, Item 2)
Drill bit installed (WP 0028)
MANUAL OPERATION OF ROD HANDLING SYSTEM
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
1.
Apply antiseize compound to threads (Figure 1, Item 3) of tophead (Figure 1, Item 1).
0024-1