• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MANUAL OPERATION OF ROD HANDLING SYSTEM - WATER WELL DRILLING RIG (WWDR)
Figure 2. Automated Rod Handling Arm Raised

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  230    231    232    233    234  235  236    237    238    239    240  
img
.
TM 5-3820-276-10-1
0024
MANUAL OPERATION OF ROD HANDLING SYSTEM - Continued
1
3
2
WWDS00662
Figure 1.
Tophead Lubrication.
2.
Push FAST FEED control (Figure 1, Item 2) forward to raise tophead (Figure 1, Item 1) to top of mast.
3.
Set and hold PIPE POSITIONING ARM CLAMP switch (Figure 2, Item 6) to up position and make sure
clamps (Figure 2, Item 4) are locked onto drill rod (Figure 2, Item 5).
0024-2
02/13/2013root(opusualwp)wpno(O10010)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.