TM 5-3825-270-23&P
0200
INSTALLATION - Continued
1, 2
3
4
5
Figure 4. Pump Drive Coupling Installation
3.
Install pump drive coupling (Figure 4, Item 3) on pump (Figure 4, Item 5) with plate (Figure 4, Item 4), six
lockwashers (Figure 4, Item 2), and screws (Figure 4, Item 1).
4.
Torque six screws (Figure 4, Item 1) to 108 lb-in (12 Nm).
END OF TASK
FOLLOW-ON MAINTENANCE
END OF TASK
END OF WORK PACKAGE