• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. 3" Valve Installation.
Figure 2. 5" Valve Installation.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  876    877    878    879    880  881  882    883    884    885    886  
img
. . . . . . .
TM 5-3825-270-23&P
0159
FIELD MAINTENANCE
5" VALVE REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
Parts Manual (WP 0220) Figure 4007
(WP 0225, Table 1, Item 12)
Equipment Condition
Materials/Parts
Valve handle removed. (WP 0180)
Locknut (WP 0226, Table 1, Item 64) Qty: 8
Gasket (WP 0226, Table 1, Item 35) Qty: 2
REMOVAL
NOTE
All 5" valves are removed the same way. Valve V2 shown.
Some valves may have other components that have to be removed or supported during
valve replacement. Remove or support other components as necessary.
Note position of valve assembly prior to removal, to ensure proper installation.
Remove eight locknuts (Figure 1, Item 5), adapter pipe (Figure 1, Item 4), gasket (Figure 1, Item 1), valve
(Figure 1, Item 3), gasket (Figure 1, Item 1), and screws (Figure 1, Item 6) from water tank assembly (Figure
1, Item 2). Discard locknuts.
1
2
3
4
5, 6
Figure 1. 5" Valve Removal.
END OF TASK
0159-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.