• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Battery Box Wiring Removal.
Figure 10. Battery Box Wiring Installation.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  484    485    486    487    488  489  490    491    492    493    494  
img
.
TM 5-3825-270-23&P
0084
REMOVAL - Continued
27
37
38
Figure 8. Battery Box Wiring Removal.
11.
Remove wire harness (Figure 8, Item 38) from water distributor.
END OF TASK
INSTALLATION
NOTE
Perform Steps (1) through (8) for battery box wire harness installation.
Perform Steps (7) through (9) for starter wire harness installation.
Route wiring as noted prior to removal.
Install cable ties and retainers as required.
Install wiring as noted prior to removal to ensure proper installation.
1.
Install wiring harness (Figure 9, Item 38) through opening in control box (Figure 9, Item 27) with fitting (Figure
9, Item 37).
27
37
38
Figure 9. Battery Box Wiring Installation.
2.
Install black wire (Figure 10, Item 30) on negative terminal strip (Figure 10, Item 29) socket 6.
0084-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.