• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Positive Terminal Strip - Step 5.
Figure 13. Water Level High Indicator - Step 7.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  256    257    258    259    260  261  262    263    264    265    266  
img
.
TM 5-3825-270-23&P
0045
STEP 6
Are less than 200 ohms measured on green wire from high tank level switch harness connector, to green/
black wire at WATER LEVEL HIGH indicator?
1.
Ensure multimeter is set to measure continuity.
2.
Connect red multimeter probe to green/black wire at WATER LEVEL HIGH indicator.
BLACK
BACK OF
WIRE
CONTROL
PANEL
WATER LEVEL
HIGH LIGHT
GREEN / BLACK
WIRE
Figure 11. Water Level High Indicator - Step 6.
3.
With the aid of an assistant using jumper wire, connect black multimeter probe to pin 2 (green wire) at high
tank level switch harness connector.
PIN 1
PIN 2
(WHITE WIRE)
(GREEN WIRE)
Figure 12. High Tank Level Switch Harness Connector - Step 6.
4.
Note multimeter reading.
CONDITION/INDICATION
Are less than 200 ohms measured on green wire from high tank level switch harness connector, to green/black
wire at WATER LEVEL HIGH indicator?
0045-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.