• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Platform.
Figure 22. Emergency Stop Button.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  513    514    515    516    517  518  519    520    521    522    523  
img
.
TM 5-3820-276-10-2
0203
Table 1.
PMCS - Grouter - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
20
Before
Service Valves
Check service valves (Figure 20, Item 1) for proper
Service valves do not
operation.
open or close freely.
Notify maintenance.
1
1
1
1
WWDS00682
Figure 20. Service Valves.
21
Before
Gear Chain
1. Raise lid (Figure 21, Item 1).
2. Check gear chain (Figure 21, Item 2) for broken or
Gear chain is broken or
missing links.
has missing links. Notify
maintenance.
1
2
WWDS00582
Figure 21. Gear Chain.
3. Close lid (Figure 21, Item 1).
22
Before
EMERGENCY
1. Start grouter (Volume 1, WP 0040).
STOP Button
0203-16
02/13/2013root(pmcswp)wpno(I20003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.