• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 17. Battery.
Figure 20. Service Valves.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  512    513    514    515    516  517  518    519    520    521    522  
img
.
TM 5-3820-276-10-2
0203
Table 1.
PMCS - Grouter - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
2
3
4
WWDS00567
Figure 18. Platform.
2. Check bolts and nuts (Figure 18, Item 4) for security. Bolts or nuts are missing.
Notify maintenance.
3. Check support chain (Figure 18, Item 2) for
Support chain damaged
damaged links or hardware.
or missing. Notify
maintenance.
4. Raise platform (Figure 18, Item 3) and rotate latch
(Figure 18, Item 1) securing platform.
19
Before
Control Levers
Check control levers (Figure 19, Item 1) for proper
Control levers do not
operation.
open or close freely.
Notify maintenance.
1
1
1
WWDS00683
Figure 19. Control Levers.
0203-15
02/13/2013root(pmcswp)wpno(I20003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.