TM 5-3820-276-10-2
0203
Table 1.
PMCS - Grouter - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
WWDS00494
Figure 4.
Coolant Line Connections.
NOTE
5
Before
Electrical
Connections
Check electrical connections as you go
around and do other PMCS checks.
Check for loose electrical connections (Figure 5, Item
Frayed wiring or loose
1) and frayed wiring.
connections. Notify
maintenance.