• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Electrical Connections
Figure 8. Hydraulic Cooling Fan

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  503    504    505    506    507  508  509    510    511    512    513  
img
. . .
TM 5-3820-276-10-2
0203
Table 1.
PMCS - Grouter - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
Precleaner is
2. Check precleaner dump (Figure 6, Item 1). Clean
contaminated and cannot
precleaner as required (WP 0211).
be cleaned. Notify
maintenance.
WARNING
7
Before
Hydraulic Oil
Do not allow hot oil or components to touch
your skin. Hot oil or components will burn
your skin. Wear heat-resistant gloves,
goggles, and protective clothing when you
work near hot oil or components. If hot oil
gets on your skin, seek medical aid
immediately. Failure to comply may result in
injury or death to personnel. Seek medical
attention in the event of an injury.
Check hydraulic oil level. Keep hydraulic oil level
Hydraulic oil is not visible
towards upper bold line (Figure 7, Item 1) but between
in sight glass. Notify
it and lower bold line (Figure 7, Item 2). Add hydraulic
maintenance.
oil as required (WP 0224).
1
2
WWDS00575
Figure 7.
Hydraulic Oil.
8
Before
Hydraulic
1. Check cooling fan (Figure 8, Item 1) for cracked or
Cooling fan blades
Cooling Fan
broken blades.
cracked or broken. Notify
maintenance.
0203-6
02/13/2013root(pmcswp)wpno(I20003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.