TM 5-3820-276-10-2
0203
Table 1.
PMCS - Grouter - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
1
WWDS00493
Figure 2.
Fuel Line Connections.
3
Before
Hoses
Check water, grout hoses, and connections (Figure 3,
Hoses or connections
Item 1) for damage.
loose or damaged. Notify
maintenance.
1
1
WWDS00684
Figure 3.
Hoses.
4
Before
Coolant Lines
Check coolant lines (Figure 4, Item 1) for leaks.
Coolant lines leaking.
Notify maintenance.