TM 5-3820-276-10-2
0202
Table 3.
PMCS - Welder/Generator - After Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
2
WWDS00932
Figure 7.
Engine Oil and Coolant.
4
After
Engine Coolant
Check to ensure coolant level is between FULL and
Engine coolant level is
LOW indicators on coolant recovery bottle (Figure 7,
not between the FULL
Item 1) when unit is cold. Add coolant as required
and LOW indicators on
the coolant recovery
bottle.
Mandatory Replacement Parts
There are no mandatory replacement parts required for this PMCS procedure.
END OF TASK
END OF WORK PACKAGE