TM 5-3820-276-10-2
0201
Table 5.
PMCS - PAC - During Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
3. Check ENGINE WATER TEMP. gauge (Figure 35,
More than 180F (82C).
Item 3) for proper operation.
Notify maintenance.
4. Check ENGINE OIL PRESS. gauge (Figure 35, Item Less than 18 psi (1 bar).
4) for proper operation.
Notify maintenance.
5. Check VOLTS gauge (Figure 35, Item 5) for proper
Not showing a charge of
operation.
22 to 28 VDC. Notify
maintenance.
6. Check DISCHARGE AIR TEMP. gauge (Figure 35,
More than 150F (66C).
Item 6) for proper operation.
Notify maintenance.
3
During
Fuel Level
Check FUEL LEVEL gauge (Figure 36, Item 1). Add
clean JP-8/DF2 diesel fuel as required (Volume 1,
WP 0056).
1
WWDS00408
Figure 36. Fuel Level.
4
During
Compressor Oil
Check compressor oil level. Compressor oil level must
Compressor oil is not
be in green area of sticker between bottom and
visible in sight glass or
midway of sight glass (Figure 37, Item 1) on separator
sticker is missing. Notify
maintenance.
02/13/2013root(pmcswp)wpno(I30001)