TM 5-3820-276-10-2
0201
Table 5.
PMCS - PAC - During Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
WWDS00205
Figure 34. Fault Indicator.
2. Check fault indicator (Figure 34, Item 1) for fault
Fault indicator displays a
maintenance.
1. Check DISCHARGE AIR PRESSURE gauge (Figure Not between 50 to 80 psi
2
During
Control Panel
Gauges
35, Item 1) for proper operation.
(3 to 6 bar) at idle. Notify
maintenance.
1
2
6
5
3
4
WWDS00096
Figure 35. Control Panel Gauges.
2. Check ENGINE SPEED gauge (Figure 35, Item 2)
Not between 1,200 to
for proper operation.
1,500 rpm at idle. Notify
maintenance.
02/13/2013root(pmcswp)wpno(I30001)