TM 5-3820-276-10-2
0201
Table 4.
PMCS - PAC - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
WWDS00007
Figure 28. Service Valve (Shown Closed).
17
Before
Operational
Start PAC (Volume 1, WP 0059) to perform PMCS
Check
steps that follow:
18
Before
Control Panel
1. Check main power control switch (Figure 29, Item 1) Engine does not start.
Switches
for proper operation.
Notify maintenance.
1
3
2
WWDS00207
Figure 29. Control Panel Switches.
2. Check LAMPS switch (Figure 29, Item 2) for proper
operation.
3. Check PRESSURE CONTROL switch (Figure 29,
Pressure control switch
Item 3) for proper operation.
does not allow
02/13/2013root(pmcswp)wpno(I30001)