TM 5-3820-276-10-2
0201
Table 4.
PMCS - PAC - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
b. Turn knurled nut (Figure 22, Item 3)
counterclockwise to open drain valve.
c. Drain until only pure fuel is coming out.
d. Close drain valve by turning knurled nut (Figure
22, Item 3) clockwise.
e. Make sure local policy for fuel disposal is
followed.
11
Before
Batteries
Check batteries (Figure 23, Item 2) or cables (Figure
Battery not secure,
23, Item 1) for security and signs of corrosion.
terminals loose or
corroded, or damaged
cables. Notify
maintenance.
1
2
WWDS00017
Figure 23. Batteries.
12
Before
Engine and
Check engine and compressor outer air filter (Figure
Air filter is contaminated
24, Item 1) and precleaner dump (Figure 24, Item 2)
and cannot be cleaned.
Filter and
Notify maintenance.
Precleaner
Dumps
02/13/2013root(pmcswp)wpno(I30001)